Products
- Speakers[3]
- Christmas Decoration Supplies[3]
- Decorative Flowers & Wreaths[5]
- Other Gifts & Crafts[6]
- Photo Albums[1]
- Stickers[3]
- Storage Boxes & Bins[4]
- Wine Refrigerators[4]
- Bag Parts & Accessories[3]
- Coin Purses[1]
- Rulers[6]
- Packaging Bags[6]
- Packaging Boxes[6]
- Packaging Tray[1]
- Paper & Paperboard Printing[1]
- Plastic Cards[6]
- Access Control Card[2]
- Advertising Light Boxes[6]
- Display Racks[6]
- Roll up Display[4]
- Banner Stands[6]
- Tennis Balls[6]
- Bracelets & Bangles[6]
- Jewelry Boxes[1]
- Wristwatches[1]
Contact Us
- Contact Person : Ms. Zhang Ivy
- Company Name : Dongguan Seismo Trading Co., Limited
- Tel : 86-0769-23667430
- Address : Guangdong,Dongguan,R803-804,Rising Dragon Business Centre,Hongfu Road,Nancheng District
- Country/Region : China
- Zip : 523073
Product Detailed
Related Categories:Wine Refrigerators
Related Product Searches:5L Beer cooler with CO2 for household,High Quality,beer cooler, 5L beer cooler,BC02
1.fresh&cold beer cooler at home
2.Available for 5L beer keg
3.environmental protection low noise material
4.Utilizes C02
Related Product Searches:5L Beer cooler with CO2 for household,High Quality,beer cooler, 5L beer cooler,BC02
Mini Beer dispenser, home 5L beer cooler
Features |
* can enjoy the cool,nice and fresh poured beer at home and the prefect drinking pleasures |
* Available for universal 5L beer keg |
* Utilizes advanced CO2 steady pressure technology to keep beer fresh for long time |
* 2°C lowest temperature. |
* Streamilne design,top-grade and luxurious |
* Made with environmental protection low noise materials |
* LED display |
Specifications |
Capacity: 5L |
Voltage: 110V/60Hz or 220-240V/50Hz |
Power consumption: 72W |
Unit dimensions: 17 1/8 * 11 3/5 * 19 1/2" |
Net Weight: 6.2 kgs |
Packing dimensions:W490*D370*H380 mm |
Gross weight: 7.2 kgs. |
Loading qty 20'/40'/40'HQ: 455/945/1080 pcs |
CE/GS/ROHS/ETL |
The packing is gift box and master carton,1pc/ctn. |
Business Terms |
1.Payment term: 30% T/T deposit,balance T/T before shipment. |
2. Production lead time: 40 days after confirmed artworks and has received the 30% deposit. |
3. Minimum Order Quantity: 1X40'GP per Model |
5L Beer cooler with CO2 for household